Aicube Care products need to be installed in a correct way to make sure users' security.
Installation:
These items of wall track, shower seats and support rails must be secured to the solid walls.
Make sure that the bathroom walls are strong enough to bear the weight up to 150kgs.
Products must be installed professional by a qualified persons, e.g.a licensed plumber.
The included fixings are for use with solid walls only. It is the installer’s responsibility to
ensure that the correct fixings are used for suit the wall type. The use of incompatible fixings
could lead to property damage and/or personal injury.
For cavity walls, the support arm must be fixed to the internal wall stud or a solid framing structure.
It is the responsibility of the installer to ensure that the wall structure is capable of supporting loads of up to 150kgs.
Care and Maintenance:
1.Clean with a soft cloth and warm soapy water
2.Do not use harsh detergents, corrosive chemicals, or abrasive cleaners.
3.We recommends that chalky deposits be removed from aluminum parts using a solution of 3:7 acetic acid: tapwater.
When the aluminium parts have been washed down with this solution, the parts must be wipped over with a damp cloth,wrung out in clear water. The product must be wipped down with a soft rag wrung out in clear water immediately
after cleaning, as some materials may otherwise be discolored and stained, and the surface coating may deteriorate.